PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bent Pour stop at the 4th Floor Facing South (1)  (800x600).jpg Bent Pour stop at the 4th Floor Facing South (2)  (800x600).jpg Finished installed the handrails at Stair -4 (1st-4th Floor) Facing East (800x600).jpg Finished installing wire mesh at the slab on grade Facing South (800x600).jpg Finished installing wire mesh at the slab on grade Facing West (800x600).jpg Installed temporary lighting at the 2nd floor Facing West (800x600).jpg Metal tracks (1) (800x600).jpg
Previous pageNext page Finished installing wire mesh at the slab on grade Facing South (800x600)
Finished installing wire mesh at the slab on grade Facing South (800x600)